The immunity test of electrical fast transient pulse group is an experiment that couples the pulse group composed of many fast transient pulses to the power supply port, control port, signal port and grounding port of electrical and electronic equipment. The main points of the test are high amplitude of transient, short rise time, high repetition rate and low energy.

The purpose of this experiment is to verify the immunity of electrical and electronic devices to various types of transient disturbances caused by , such as switching transient processes (cutting off inductive load, relay contact bouncing, etc.).

The GB/T17626.4 deals with the immunity requirements and test methods of electrical and electronic equipment for repetitive electrical fast transients. In addition, the range of test grades is defined and the test procedure is confirmed. The purpose of this paper is to determine a common evaluation basis which is repeatable for evaluating the performance of power ports, signals, control ports and grounding ports of electrical and electronic equipment when they are affected by electrical fast transient (pulse group) interference.

1.Test Grade

Open Circuit Output Test Voltage and Pulse Repetition Frequency

Open circuit output test voltage and pulse repetition frequency Open circuit output test voltage and pulse repetition frequency

Grade

Power supply port, protect the ground(PE)

PE

In the I / O (input/output) signal, data and control port

Voltage Peak Value/kV

Repetition Frequency /kHz

Voltage Peak Value/kV

Repetition

Frequency /kHz

1

0.5

5 or 100

0.25

5 or 100

2

1

5 or 100

0.5

5 or 100

3

2

5 or 100

1

5 or 100

4

4

5 or 100

2

5 or 100

×

Particular

Particular

Particular

Particular

2. Test Method


Schematic Diagram of Test Configuration of Electrical Fast Transient Pulse Test

3. Conclusion of Test Result

The test results should be classified according to the loss of function or degradation of performance of the tested equipment. The relevant performance level shall be determined by the manufacturer of the equipment or the demand-side of the test, or by the agreement of the manufacturer and the buyer of the product. It is proposed that the classification be based on the following requirements:

A) Normal performance within the limits set by the manufacturer, the entrusting party or the procuring party;

B) Temporary loss or reduction of function or performance, but self-recovery after cessation of harassment without the need of intervention by the operator;

C) Function or performance is temporarily lost or reduced, but operator intervention is needed to recover.

D) Unrecoverable loss of function or reduction of performance due to equipment hardware or software damage or data loss.



Jinan Filtemc Electronic Equipment Co., Ltd   

Technical support:Guoxunkeji   

鲁ICP备16005018号

  • 14°度梅花秀酒(果子酒)300ml【价格 品牌 图片 评论】 2019-04-20
  • 重整山河傲风骨 巴尔干“白鹰”能否浴火重生 2019-04-20
  • 喝了6瓶劲酒和1斤白酒 男子手持钢锯在重庆西站撒泼遭控制 2019-04-19
  • “中国网事·感动2018”一季度网络感动人物评选启动 2019-04-18
  • 望海楼:“上海精神”的新时代内涵 2019-04-18
  • 好管家 香菇五花肉烧黄鱼 2019-04-17
  • 广州推出4006套公租房 记者实探6大盘 2019-04-16
  • “一地两检”条例草案在香港特区立法会通过三读 2019-04-15
  • 党史纵横--安徽频道--人民网 2019-04-14
  • 特朗普是个典型的笑面虎,当面笑嘻嘻,底下捅刀子 2019-04-14
  • 只有两种可能,你任选一种 2019-04-13
  • 古人清居生活是啥样?看看这些书画你就知道 2019-04-13
  • 崇尚英雄 精忠报国——我们家的报国故事 2019-04-12
  • 省招生考试管理中心发出中考温馨提示 2019-04-11
  • 【理上网来】端午节,聆听习近平谈“爱国” 2019-04-11
  • 301| 70| 505| 932| 801| 802| 874| 446| 582| 1|